Development · Washington, DC

Commercial Pro Forma: From Renovation Budget to Realizable Exit

Build a DC commercial project pro forma that separates sources and uses, monthly lease-up cash, stabilized NOI, income value and equity returned.

3 min readUse the evidence worksheet ↓
Prepared by Washington DC Fix and Flip Loan · Updated · Editorial method
The decision in brief

A useful pro forma connects three schedules: total sources and uses, monthly execution cash flow, and stabilized operating/exit analysis. Keep them separate and reconcile them. A balanced funding table does not prove profitability; positive stabilized NOI does not prove the project can survive construction and lease-up.

Transparent planning methodology; lender definitions may differ

First schedule: sources and uses

UsesSources / treatment
Purchase, acquisition costs and diligenceEquity and actual initial loan advances
Hard/soft costs and expected contingency spendRehab funding subject to draw conditions; owner cash before reimbursement
TI/LC, concessions and lease-up deficitExplicit equity/debt funding where permitted
Financing fees, interest and closing reservesReserve allocation is funding; later expense must not be deducted twice
Unused reserve or unspent contingencyTrack separately from consumed project cost

Check that sources fund each payment when due, not only that totals balance at the end. Define eligible cost for LTC; a lender may exclude acquisition fees, contingencies or other items that belong in the investor’s total project cost.

Second schedule: monthly execution cash

Use actual expected dates for purchase, contractor payments, draws, interest, leasing costs, occupancy and exit. Rent commencement may differ from lease execution or physical completion. Show taxes, insurance, utilities, security, maintenance and other operating expenses during vacancy.

Record base, delayed completion and delayed lease-up scenarios. If a draw reimburses an earlier contractor payment, it reduces the funding gap; it does not reduce construction cost. Show peak external cash required and where funding is still conditional.

Third schedule: stabilized operating income

LineMethod
Potential incomeDocument rent and other income assumptions with leases or market evidence.
Vacancy / credit / concessionsApply consistently to potential income; do not deduct again from a net collected-income input.
Effective gross incomePotential income less losses plus defined other/reimbursement income.
Operating expensesRecurring owner expenses; separate reimbursement treatment and management fee basis.
NOI and underwriting adjustmentsShow NOI before financing/capex, then lender-defined reserves/normalizations separately.

A snapshot must identify the period and level of stabilization. Do not annualize one unusually strong month or assume all lease expirations renew without cost.

Value, yield on cost and equity returns answer different questions

Modeled income value = stabilized annual NOI ÷ assumed exit cap. Yield on cost = stabilized NOI ÷ defined total project cost. Equity return depends on dated equity contributions and distributions after actual debt/fees. A cap-rate spread or gross “created value” is not a realized equity return.

Illustrative $240,000 NOI on $3 million project cost is an 8% yield on cost. At a 6% assumed cap, modeled value is $4 million, but the $1 million difference is before selling expenses, remaining costs, debt terms, timing and tax. It is not a guaranteed profit or a current DC valuation.

Reconcile the exit to cash actually available

At refinancing, apply the lowest enabled lender constraint and subtract old payoff, closing charges and holdbacks. At sale, subtract selling costs and debt payoff. Account for any unused reserve release only once. If amortization exceeds loan term, show the unpaid balloon at maturity.

The commercial analyzer shows cap/NOI sensitivity, debt constraints and the refinance gap. Its illustrative $240,000 NOI case produces about $2.165 million DSCR-limited debt—not the $2.6 million implied by LTV alone.

Attach evidence and decision owners

For each assumption, record source, date, unit, scope and unresolved limitation. Lease income comes from an executed lease or a clearly labeled assumption; legal use comes from appropriate records; a program benefit comes from an actual eligibility/award determination. DC occupancy and energy-compliance requirements can change both costs and delivery.

Sources: DC Department of Buildings: Certificate of Occupancy and zoning questions; DC Department of Energy & Environment: BEPS revised guidebook version 1.2 announcement.

Keep one base scenario, log revisions and explain why numbers changed. A downloadable ledger should reproduce the visible result and retain assumption labels.

Put the guide to work

Your evidence worksheet

Record what you found and what remains open. Nothing is submitted or saved automatically. Download a local copy to keep your work before leaving this page. A selected status is your note, not an agency approval.

1. Dated sources and uses

Record the supporting document, source/date, unresolved issue and next action.

2. Lease-up cash versus stabilized NOI

Record the supporting document, source/date, unresolved issue and next action.

3. Net exit after costs and debt

Record the supporting document, source/date, unresolved issue and next action.

3 evidence questions · No input transmission

Sources & update notes

Source review dated October 24, 2026. Access notes distinguish readable guidance from portal entry points. Our calculations are hypothetical analysis, not agency findings or lender offers.

October 24, 2026: Rewritten with a specific decision framework, primary sources and worked analysis.

Report a correction or changed source. A source-check date does not represent independent professional sign-off.

Put this decision into numbers

Test your assumptions.