Flooring and tile scope should include substrate condition, flatness, moisture, waterproofing, transitions and movement provisions appropriate to the system. Product price is only part of installed cost.
Washington, DC investor planning. Agency requirements are distinct from our analytical methods; no property-specific approval, market quote or professional sign-off is represented.
Work through this decision
- Evaluate the substrate and moisture source.
- Coordinate bathroom waterproofing and thresholds with adjacent trades.
- Approve layout, quantities and acceptance before purchase.
Evidence to collect
| Evidence | How to use it |
|---|---|
| System specification | match product and installation requirements. |
| Scope | identify preparation, waste, trim and demolition. |
| Acceptance | document relevant tests and concealed waterproofing. |
The mistake to catch before committing
A low tile labor price that excludes substrate repair or waterproofing can be a large budget gap. Do not judge a wet-area assembly only by the finished grout lines.
Connect the scope to DC approvals and closeout
Open the DC agency background for this decision
Use the current DOB permit instructions to identify the application route for the actual work and building use. One- and two-family work and commercial projects do not always follow the same intake route. A contractor estimate is not evidence that required permits, trade reviews or inspections are included. Ask the designer and contractor to identify the approval and inspection dependencies in writing.
DOB warns that its integrated 2017 code books do not show amendments adopted after May 29, 2020; Title 12 DCMR is the official text to confirm. A code modernization announcement does not itself establish which provisions govern your application. Record the governing edition and amendments on the design basis.
| Control point | Record to retain |
|---|---|
| Before work | Issued scope, approved drawings, responsibility for each trade and any conditions |
| Before concealment | Required inspection result, approved revision if conditions differ, and dated photos |
| Before final payment | Final results, unresolved deficiencies, warranties, manuals and turnover records |
Sources: DC Department of Buildings: DC construction codes and official amendments; DC Department of Buildings: Permitting in the District of Columbia; DC Department of Buildings: Construction inspection services.
Your evidence worksheet
Record what you found and what remains open. Nothing is submitted or saved automatically. Download a local copy to keep your work before leaving this page. A selected status is your note, not an agency approval.
Sources & update notes
Source review dated October 24, 2026. Access notes distinguish readable guidance from portal entry points. Our calculations are hypothetical analysis, not agency findings or lender offers.
- DC construction codes and official amendmentsDC Department of Buildings · Guidance reviewed 2026-10-24
- Permitting in the District of ColumbiaDC Department of Buildings · Guidance reviewed 2026-10-24
- Construction inspection servicesDC Department of Buildings · Guidance reviewed 2026-10-24
October 24, 2026: Replaced the earlier outline with topic-specific workflow, evidence questions, decision tests and primary-source notes.
Report a correction or changed source. A source-check date does not represent independent professional sign-off.