Financing comparison tool · Washington, DC

Loan Offer & Extension Cost Comparison

Which quoted loan costs less if the exit takes longer?

Private browser calculationBase + risk comparisonCSV · project file · print

Method reviewed October 25, 2026 · All prefilled amounts and rates are hypothetical examples. Replace them with supported project figures.

Build a decision you can explain.

Compare fully advanced interest-only offers at the same principal, including net funding, points, minimum interest, exit fees and permitted extension costs. Read the method and boundaries.

View the current comparison ↓

Enable JavaScript to calculate. The methodology and source notes remain available below.

Common financing requirement

Comparable written offers

Use a private reference. All rows and amounts below are illustrative until you replace them.

Offer 1
Offer 2
Worked hypothetical example

A lower rate can lose its advantage after an extension

Separate hypothetical illustration matching the prefilled offers: gross principal $500,000; Offer A has 12% initial interest, two points and $1,000 upfront fees, a nine-month term and one three-month extension at 13% plus one point. Offer B has 14% interest, one point and $1,000 fees with a 12-month term. Both have a three-month minimum and no entered exit fee.

Worked hypothetical illustration
Payoff timingOffer A costOffer B cost
Month 9$56,000$58,500
Month 12$77,250$76,000

The extra extension interest and fee reverse the lower-cost result. Principal repayment is excluded from financing cost; compare net proceeds and loan conditions separately.

Method, assumptions and DC source boundaries

These equations are our planning analysis. Agency sources explain legal or supervisory context; they do not validate a property, approve a lender request or supply the fictional rates and prices above. Method version 2026-10-25.2.

  1. Use the same gross principal for offers funding the same project. This is a fully advanced, interest-only model. Upfront points and fees are withheld, so usable loan proceeds differ. It is unsuitable for staged draws, amortization, floating-rate resets or compounding default interest.
  2. Interest equals principal × nominal annual rate × months / 12, split at initial maturity. The entered minimum-interest floor equals original principal × initial rate × minimum months / 12; billed interest is the greater of this floor and timed interest. Enter a separately quoted payoff charge only if it does not duplicate that floor.
  3. Each started extension block incurs the full entered extension fee. Maximum blocks and extension rate are scenario terms you must verify; eligibility, consent and covenants are not granted by this tool. No complete cost or lowest-cost result is shown beyond entered maturity plus permitted extension capacity.
  4. Financing cost includes interest, upfront charges, extension fees and entered exit charges, excluding principal repayment. The payoff cash figure separately includes principal and exit charges; periodically paid interest is not charged again at payoff.
  5. Only offers marked reconciled with a modeled payoff within their entered term capacity enter the lowest-cost comparison. A lower modeled cost does not verify underwriting, funding reliability, collateral, recourse or legal terms. Net proceeds and the owner cash gap remain separate from cost.

Evidence to confirm

  • Commercial Real Estate Lending, version 2.0Office of the Comptroller of the Currency · Context reviewed October 25, 2026 · Bank supervisory reference reviewed 2026-10-24, including March 2025 update note; not universal private-lender terms

Keep actual quotes, leases, tax/closing calculations, approval records and release conditions with your project. No automatic entitlement, valuation, savings or funding outcome is represented.