Contractor Bid & Scope Comparison

Which bid is lower after the same work and timing are included?

Private browser calculationBase + risk comparisonCSV · project file · print

Method reviewed October 25, 2026 · All prefilled amounts and rates are hypothetical examples. Replace them with supported project figures.

Build a decision you can explain.

Compare contractor bids on installed scope, allowances, exclusions, owner purchases, timing carry and unresolved-cost reserves. Read the method and boundaries.

View the current comparison ↓

Enable JavaScript to calculate. The methodology and source notes remain available below.

Work-package comparison

Bids on the same work package

Use a private reference. All rows and amounts below are illustrative until you replace them.

Bid 1
Bid 2
Bid 3

Method, assumptions and DC source boundaries

These equations are our planning analysis. Agency sources explain legal or supervisory context; they do not validate a property, approve a lender request or supply the fictional rates and prices above. Method version 2026-10-25.1.

  1. Enter each omitted amount only once. Allowance adjustments are additions beyond the amount already included in the quote. Credits reduce the same installed scope and require evidence.
  2. Known comparison cost equals normalized installed cost plus stated duration times weekly carry. The risk-funded case additionally spends the entered unresolved-scope reserve and adds the selected extra weeks. A reserve is not represented as a contractor commitment.
  3. The lowest reconciled price is a cost comparison among scopes you mark reconciled. It does not verify licensing, competence, insurance, contracts, warranties or payment rights, and does not recommend a contractor.

Evidence to confirm

Keep actual quotes, leases, tax/closing calculations, approval records and release conditions with your project. No automatic entitlement, valuation, savings or funding outcome is represented.