Resources & Agencies · Washington, DC

Construction Draw Request Checklist

A draw package should reconcile eligible work, prior funding and current requested cash under the actual loan agreement.

2 min readUse the evidence worksheet ↓
Prepared by Washington DC Fix and Flip Loan · Updated · Editorial method
The decision in brief

A draw package should reconcile eligible work, prior funding and current requested cash under the actual loan agreement. Contractor invoices alone may not satisfy the lender's conditions.

Washington, DC investor planning. Agency requirements are distinct from our analytical methods; no property-specific approval, market quote or professional sign-off is represented.

Work through this decision

  1. Read the required package and inspection process.
  2. Reconcile budget, changes, payments and progress.
  3. Track submission, exceptions, approval and actual receipt.

Evidence to collect

EvidenceHow to use it
Cost ledger distinguish approved, paid and forecast amounts.
Evidence retain required invoices, inspections and release documents.
Cash fund the period before reimbursement.

The mistake to catch before committing

An approved draw is not received money. Keep temporary equity and permanent cost contributions separate, and never fabricate progress evidence to accelerate funding.

Compare financing by cash flow and exit obligations

Open the DC agency background for this decision

There is no universal DC investor loan rate, leverage limit, draw speed or seasoning period. Compare written terms for the actual borrower, collateral, scope and exit. Identify what costs are eligible, the valuation basis, funded balance, holdbacks, points base, interest convention, reserves, maturity, extension and payoff terms.

QuestionUnderwriting treatment
What is funded when?Put initial proceeds and later reimbursements on a dated cash schedule
What accrues?Compute interest on the contractually defined balance; identify minimum interest and default charges
What cash is restricted?Separate reserves, borrower equity and available operating cash
What repays it?Deduct selling/refinance costs and apply release or prepayment provisions

For a commercial refinance, size proceeds under every applicable constraint, including lender-defined DSCR, LTV and debt yield where required. A residential DSCR program may compare qualifying rent with PITIA rather than commercial NOI with annual debt service. Do not mix these definitions. Closing taxes are transaction-specific; a refinance or entity transfer should be reviewed for its own tax treatment.

Sources: DC Law Library: DC Code §42-1103: recordation tax; DC Law Library: DC Code §47-903: transfer tax; DC Office of Tax and Revenue: Recorder of Deeds: tax rates and recording questions.

Put the guide to work

Your evidence worksheet

Record what you found and what remains open. Nothing is submitted or saved automatically. Download a local copy to keep your work before leaving this page. A selected status is your note, not an agency approval.

1. Cost ledger

distinguish approved, paid and forecast amounts.

2. Evidence

retain required invoices, inspections and release documents.

3. Cash

fund the period before reimbursement.

3 evidence questions · No input transmission

Sources & update notes

Source review dated October 24, 2026. Access notes distinguish readable guidance from portal entry points. Our calculations are hypothetical analysis, not agency findings or lender offers.

October 24, 2026: Replaced the earlier outline with topic-specific workflow, evidence questions, decision tests and primary-source notes.

Report a correction or changed source. A source-check date does not represent independent professional sign-off.