Schedule risk is the uncertainty in dependencies that can delay completion, income or sale. Assign mitigation to the actual critical path and maintain a funded delay case.
Washington, DC investor planning. Agency requirements are distinct from our analytical methods; no property-specific approval, market quote or professional sign-off is represented.
Work through this decision
- Identify approval, utility, procurement, inspection and turnover gates.
- Distinguish available float from activities that move completion.
- Reforecast capital, maturity and exit after material changes.
Evidence to collect
| Evidence | How to use it |
|---|---|
| Dependency schedule | show predecessor and responsible party. |
| Risk register | define trigger and mitigation. |
| Cash model | include extension, operating and leasing effects. |
The mistake to catch before committing
Adding crews cannot cure an unapproved design or unavailable utility connection. A shorter construction duration also does not guarantee an earlier sale or stabilized income date.
Forecast the date when the asset can perform, not just when work stops
Define the investment's delivery milestone: lawful residential occupancy, a buyer-ready condominium, commercial rent commencement or another evidenced event. Physical construction completion is only one predecessor. Place permits, design responses, applicable neighbor notice/access, utility readiness, tests, inspections, purchaser documents and tenant work on the same dependency map. Use current project instructions rather than a universal DC permit duration.
For every critical dependency, record the predecessor, responsible party, evidence of readiness, remaining duration and float. A supplier's promised shipment is not installed and tested capacity. A commercial tenant's signed lease may not start rent until landlord work or other conditions are met. DOB's electronic review guidance distinguishes submission from issued approval; its neighbor guidance adds scope-specific notice and protection steps. Show those real gates instead of hiding them in a single 'approvals' bar.
| Schedule control | Weekly evidence |
|---|---|
| Required milestone | Precise legal/physical/contractual delivery event |
| Critical dependency | Actual predecessor, owner, next decision and current record |
| Float and recovery | Usable time buffer and approved scope/resource alternative |
| Funding consequence | Dated carry, reserve depletion, maturity and delivery commitments |
Sources: DC Department of Buildings: Permit resources and submission checklists; DC Department of Buildings: ProjectDox FAQs; DC Department of Buildings: Neighbor notification and protection of adjoining property.
Pay for recovery only when it changes the delivery path
Assume a three-week critical-path delay adds $2,200 per week of financing/property carry and $1,000 per week of other supported delivery costs. The assumed total is $9,600. An $8,000 recovery package that genuinely avoids all three weeks has a $1,600 direct advantage, before checking quality, permissions and other effects. If it only accelerates noncritical work within available float, the same package does not avoid that delay cost.
Keep a cost waterfall separating fixed commitments, duration-driven costs, contingent extension charges and uncertain revenue timing. Update interest and restricted reserves from actual loan terms; OCC's CRE guidance explains why delay and depleted reserves deserve active monitoring, but it is not a promise of additional funding. Establish a trigger date for reducing scope, injecting equity, negotiating a lawful extension or changing the exit. Record the recovery decision and revised logic so the next weekly forecast does not quietly return to an obsolete completion date.
Sources: Office of the Comptroller of the Currency: Commercial Real Estate Lending, version 2.0; DC Department of Buildings: Permit resources and submission checklists.
Connect the scope to DC approvals and closeout
Open the DC agency background for this decision
Use the current DOB permit instructions to identify the application route for the actual work and building use. One- and two-family work and commercial projects do not always follow the same intake route. A contractor estimate is not evidence that required permits, trade reviews or inspections are included. Ask the designer and contractor to identify the approval and inspection dependencies in writing.
DOB warns that its integrated 2017 code books do not show amendments adopted after May 29, 2020; Title 12 DCMR is the official text to confirm. A code modernization announcement does not itself establish which provisions govern your application. Record the governing edition and amendments on the design basis.
| Control point | Record to retain |
|---|---|
| Before work | Issued scope, approved drawings, responsibility for each trade and any conditions |
| Before concealment | Required inspection result, approved revision if conditions differ, and dated photos |
| Before final payment | Final results, unresolved deficiencies, warranties, manuals and turnover records |
Sources: DC Department of Buildings: DC construction codes and official amendments; DC Department of Buildings: Permitting in the District of Columbia; DC Department of Buildings: Construction inspection services.
Your evidence worksheet
Record what you found and what remains open. Nothing is submitted or saved automatically. Download a local copy to keep your work before leaving this page. A selected status is your note, not an agency approval.
Sources & update notes
Source review dated October 25, 2026. Access notes distinguish readable guidance from portal entry points. Our calculations are hypothetical analysis, not agency findings or lender offers.
- Construction permits and developer servicesDC Water · Guidance reviewed 2026-10-24
- New construction and remodeling servicesPepco · Service entry point checked 2026-10-24; interactive project instructions must be confirmed directly
- DC construction codes and official amendmentsDC Department of Buildings · Guidance reviewed 2026-10-24
- Permitting in the District of ColumbiaDC Department of Buildings · Guidance reviewed 2026-10-24
- Construction inspection servicesDC Department of Buildings · Guidance reviewed 2026-10-24
- Permit resources and submission checklistsDC Department of Buildings · Guidance reviewed 2026-10-24
- ProjectDox FAQsDC Department of Buildings · Guidance reviewed 2026-10-24
- Neighbor notification and protection of adjoining propertyDC Department of Buildings · Guidance reviewed 2026-10-25
- Commercial Real Estate Lending, version 2.0Office of the Comptroller of the Currency · Published 2022-03 · Bank supervisory reference reviewed 2026-10-24, including March 2025 update note; not universal private-lender terms
October 25, 2026: Deepened with a dependency-led completion forecast and delay-cost waterfall; added project evidence questions and primary-source applicability notes.
Report a correction or changed source. A source-check date does not represent independent professional sign-off.