Landscaping should manage water without creating foundation, adjoining-property or public-space problems. Start with grades, drainage paths and regulatory applicability rather than selecting planting alone.
Washington, DC investor planning. Agency requirements are distinct from our analytical methods; no property-specific approval, market quote or professional sign-off is represented.
Work through this decision
- Map existing runoff, low points and utility conflicts.
- Have qualified civil/landscape professionals assess proposed changes.
- Coordinate erosion control, stormwater, GAR and tree requirements where applicable.
Evidence to collect
| Evidence | How to use it |
|---|---|
| Site plan | show grades and drainage responsibility. |
| Approvals | record relevant DOEE and DDOT conditions. |
| Maintenance | assign upkeep and replacement of landscape systems. |
The mistake to catch before committing
A sump or new paving does not prove the underlying water problem is solved. Do not direct runoff onto a neighbor or assume a small yard is outside environmental review.
Map where water comes from and where it may lawfully go
Have the qualified site/design team document existing grades, roof/downspout connections, low areas, foundation symptoms, paved surfaces and proposed water paths. A puddle-free photograph on a dry day does not establish drainage performance. Identify the cause of basement moisture before buying interior finishes; EPA's renovation guidance emphasizes correcting water sources before affected enclosure upgrades. A landscape plan is not an authorization to send water onto a neighbor or into a utility system.
Screen the actual work for DOEE stormwater, GAR and erosion-control requirements, tree protection, public-space boundaries and any utility approvals. These are separate reviews. A small garden renovation can still disturb land or affect protected trees, while a commercial loading area adds surface use, access and maintenance demands. Obtain the appropriate professional design and agency/utility determinations instead of selecting a drain or infiltration feature from a generic detail.
| Site decision | Evidence |
|---|---|
| Water source and route | Measured conditions, qualified findings and downstream destination |
| Land/right boundary | Survey, easements, public space and neighbor interfaces |
| Applicable approvals | Stormwater/GAR/ESC, tree and utility scope with actual status |
| Long-term access | Inspection/cleaning access, responsible owner and maintenance cost |
Sources: DC Department of Energy & Environment: Stormwater regulations and guidebook, including 2025 amendments; DC Department of Energy & Environment: Green Area Ratio overview; DC Department of Energy & Environment: Soil erosion and sediment control overview; District Department of Transportation: Urban forestry and tree permits; DC Water: Water and sewer permit application types; US Environmental Protection Agency: Energy Savings Plus Health: indoor-air-quality guidelines for single-family building upgrades.
Evaluate the installed and maintained system
Normalize bids for investigation, excavation, approved conveyance/retention, utility connections, soil/materials, plantings, surface restoration and maintenance establishment. Establish professional checks before backfill or concealment. Record the approved routing and any field changes. A decorative planting allowance does not include every engineered drainage component, and a green roof or permeable surface must be evaluated as the actual designed assembly.
Hypothetically, drainage/site work costs $24,000, landscape restoration $9,000 and an assumed maintenance programme $1,500 annually. Over three years the simple undiscounted known cost is $37,500, before replacements or other obligations. Do not compare that with another proposal's installation-only total. For an income property, distinguish recurring owner-paid maintenance from capital cost and identify any supported lease recoveries. Retain as-builts, accepted inspections, product/plant records and the maintenance calendar for management or the association. Verify the correction with the qualified team under relevant conditions rather than closing a water issue solely because the new surface looks finished.
Sources: DC Department of Energy & Environment: Stormwater regulations and guidebook, including 2025 amendments; DC Department of Energy & Environment: Green Area Ratio overview; DC Water: Water and sewer permit application types.
Connect the scope to DC approvals and closeout
Open the DC agency background for this decision
Use the current DOB permit instructions to identify the application route for the actual work and building use. One- and two-family work and commercial projects do not always follow the same intake route. A contractor estimate is not evidence that required permits, trade reviews or inspections are included. Ask the designer and contractor to identify the approval and inspection dependencies in writing.
DOB warns that its integrated 2017 code books do not show amendments adopted after May 29, 2020; Title 12 DCMR is the official text to confirm. A code modernization announcement does not itself establish which provisions govern your application. Record the governing edition and amendments on the design basis.
| Control point | Record to retain |
|---|---|
| Before work | Issued scope, approved drawings, responsibility for each trade and any conditions |
| Before concealment | Required inspection result, approved revision if conditions differ, and dated photos |
| Before final payment | Final results, unresolved deficiencies, warranties, manuals and turnover records |
Sources: DC Department of Buildings: DC construction codes and official amendments; DC Department of Buildings: Permitting in the District of Columbia; DC Department of Buildings: Construction inspection services.
Your evidence worksheet
Record what you found and what remains open. Nothing is submitted or saved automatically. Download a local copy to keep your work before leaving this page. A selected status is your note, not an agency approval.
Sources & update notes
Source review dated October 25, 2026. Access notes distinguish readable guidance from portal entry points. Our calculations are hypothetical analysis, not agency findings or lender offers.
- Soil erosion and sediment control overviewDC Department of Energy & Environment · Guidance reviewed 2026-10-24
- Stormwater regulations and guidebook, including 2025 amendmentsDC Department of Energy & Environment · Guidance reviewed 2026-10-24
- Green Area Ratio overviewDC Department of Energy & Environment · Guidance reviewed 2026-10-24
- Urban forestry and tree permitsDistrict Department of Transportation · Guidance reviewed 2026-10-24
- DC construction codes and official amendmentsDC Department of Buildings · Guidance reviewed 2026-10-24
- Permitting in the District of ColumbiaDC Department of Buildings · Guidance reviewed 2026-10-24
- Construction inspection servicesDC Department of Buildings · Guidance reviewed 2026-10-24
- Water and sewer permit application typesDC Water · Guidance reviewed 2026-10-24
- Energy Savings Plus Health: indoor-air-quality guidelines for single-family building upgradesUS Environmental Protection Agency · Published 2021 · Guidance reviewed 2026-10-25
October 25, 2026: Deepened with a water-path and site-rights assessment with maintenance funding; added project evidence questions and primary-source applicability notes.