A GC selection should test the actual contracting entity, relevant project experience, scope completeness and financial controls. A polished proposal does not establish authority, coverage or ability to finish this building.
Washington, DC investor planning. Agency requirements are distinct from our analytical methods; no property-specific approval, market quote or professional sign-off is represented.
Work through this decision
- Verify identity, licensing and insurance with current records.
- Check relevant references and normalize bids.
- Agree schedule, change, payment and closeout evidence before a deposit.
Evidence to collect
| Evidence | How to use it |
|---|---|
| Entity | match contract, coverage and payment recipient. |
| Bid | identify allowances, exclusions and subcontract scope. |
| Controls | define progress verification and approval authority. |
The mistake to catch before committing
Do not compare a cost-plus estimate with an incomplete lump sum as if they carry the same price risk. Resolve what the owner still buys, coordinates and insures.
Connect the scope to DC approvals and closeout
Open the DC agency background for this decision
Use the current DOB permit instructions to identify the application route for the actual work and building use. One- and two-family work and commercial projects do not always follow the same intake route. A contractor estimate is not evidence that required permits, trade reviews or inspections are included. Ask the designer and contractor to identify the approval and inspection dependencies in writing.
DOB warns that its integrated 2017 code books do not show amendments adopted after May 29, 2020; Title 12 DCMR is the official text to confirm. A code modernization announcement does not itself establish which provisions govern your application. Record the governing edition and amendments on the design basis.
| Control point | Record to retain |
|---|---|
| Before work | Issued scope, approved drawings, responsibility for each trade and any conditions |
| Before concealment | Required inspection result, approved revision if conditions differ, and dated photos |
| Before final payment | Final results, unresolved deficiencies, warranties, manuals and turnover records |
Sources: DC Department of Buildings: DC construction codes and official amendments; DC Department of Buildings: Permitting in the District of Columbia; DC Department of Buildings: Construction inspection services.
Your evidence worksheet
Record what you found and what remains open. Nothing is submitted or saved automatically. Download a local copy to keep your work before leaving this page. A selected status is your note, not an agency approval.
Sources & update notes
Source review dated October 24, 2026. Access notes distinguish readable guidance from portal entry points. Our calculations are hypothetical analysis, not agency findings or lender offers.
- Housing business licensingDC Department of Licensing and Consumer Protection · Official agency entry point; confirm current category and project instructions directly
- Small business insurance resourcesDC Department of Insurance, Securities and Banking · Guidance reviewed 2026-10-24
- DC construction codes and official amendmentsDC Department of Buildings · Guidance reviewed 2026-10-24
- Permitting in the District of ColumbiaDC Department of Buildings · Guidance reviewed 2026-10-24
- Construction inspection servicesDC Department of Buildings · Guidance reviewed 2026-10-24
October 24, 2026: Replaced the earlier outline with topic-specific workflow, evidence questions, decision tests and primary-source notes.
Report a correction or changed source. A source-check date does not represent independent professional sign-off.