AIA is a family of contract forms; lump sum is a pricing method. They are not mutually exclusive alternatives. Choose contract structure and pricing with counsel…

2 min readUse the evidence worksheet ↓
Prepared by Washington DC Fix and Flip Loan · Updated · Editorial method
The decision in brief

AIA is a family of contract forms; lump sum is a pricing method. They are not mutually exclusive alternatives. Choose contract structure and pricing with counsel based on scope certainty and risk allocation.

Washington, DC investor planning. Agency requirements are distinct from our analytical methods; no property-specific approval, market quote or professional sign-off is represented.

Work through this decision

  1. Define price basis and incorporated scope documents.
  2. Review changes, schedule, payment, insurance, termination and dispute clauses.
  3. Reconcile exhibits and exclusions before execution.

Evidence to collect

EvidenceHow to use it
Document list identify controlling drawings, specifications and amendments.
Price distinguish fixed, allowance, unit and reimbursable items.
Authority name who can approve changes.

The mistake to catch before committing

A fixed price does not mean every imaginable condition is included. A standard form also requires project-specific completion and legal review; its brand is not protection against conflicting exhibits.

Connect the scope to DC approvals and closeout

Open the DC agency background for this decision

Use the current DOB permit instructions to identify the application route for the actual work and building use. One- and two-family work and commercial projects do not always follow the same intake route. A contractor estimate is not evidence that required permits, trade reviews or inspections are included. Ask the designer and contractor to identify the approval and inspection dependencies in writing.

DOB warns that its integrated 2017 code books do not show amendments adopted after May 29, 2020; Title 12 DCMR is the official text to confirm. A code modernization announcement does not itself establish which provisions govern your application. Record the governing edition and amendments on the design basis.

Control pointRecord to retain
Before workIssued scope, approved drawings, responsibility for each trade and any conditions
Before concealmentRequired inspection result, approved revision if conditions differ, and dated photos
Before final paymentFinal results, unresolved deficiencies, warranties, manuals and turnover records

Sources: DC Department of Buildings: DC construction codes and official amendments; DC Department of Buildings: Permitting in the District of Columbia; DC Department of Buildings: Construction inspection services.

Put the guide to work

Your evidence worksheet

Record what you found and what remains open. Nothing is submitted or saved automatically. Download a local copy to keep your work before leaving this page. A selected status is your note, not an agency approval.

1. Document list

identify controlling drawings, specifications and amendments.

2. Price

distinguish fixed, allowance, unit and reimbursable items.

3. Authority

name who can approve changes.

3 evidence questions · No input transmission

Sources & update notes

Source review dated October 24, 2026. Access notes distinguish readable guidance from portal entry points. Our calculations are hypothetical analysis, not agency findings or lender offers.

October 24, 2026: Replaced the earlier outline with topic-specific workflow, evidence questions, decision tests and primary-source notes.

Report a correction or changed source. A source-check date does not represent independent professional sign-off.